Town planning in the City of Greater Dandenong.

Dandenong · Noble Park · Springvale · Keysborough · Doveton · Bangholme

Greater Dandenong is the industrial and logistics engine of Melbourne's south-east, anchored by the Dandenong metropolitan activity centre and the vast employment precincts of Dandenong South.

For applicants, that means two quite different planning worlds: high-volume residential and mixed-use work through Springvale, Noble Park and Keysborough, and industrial applications where traffic, interface and staging questions dominate. Development Plan Overlays structure much of the growth-front land.

Our landmark work here is Keysborough South: we prepared Amendment C36 and the Development Plan that rezoned a major tract of rural land into one of the south-east's most significant residential precincts — coordinating urban design, traffic, biodiversity, stormwater and open-space equalisation across multiple landowners. Few consultancies have taken a Greater Dandenong project from paddock to precinct at that scale.

The planning framework

Controls you'll commonly meet in Greater Dandenong.

Every property is different — these are the zones and overlays that most often shape applications in this municipality. Each links to the current ordinance in the Greater Dandenong planning scheme.

Permit activity

What the numbers say about Greater Dandenong.

14,167

planning applications recorded, FY2015–16 to FY2022–23

93%

of determined applications resulted in a permit or notice of decision

114 days

median time from lodgement to decision

Source: Department of Transport and Planning, Planning Permit Activity Reporting (PPARS) register — historical data to mid-2023. Withdrawn and lapsed applications are excluded from the approval rate. These figures describe the council overall — your site's prospects depend on its specific controls.

FAQs

Questions we’re asked most.

If you have a question that’s not here, call us — we answer honestly, whether or not it leads to work.

  • A DPO requires a development plan to be approved before permits can issue, and once one is in place, applications consistent with it are generally exempt from third-party notice and appeal. Where your land sits relative to an approved development plan changes both your obligations and your risk profile — we advise on both, having written one of the area's development plans ourselves.

Got a site, a permit, or a refusal on your desk?

An obligation-free conversation is the fastest way to see if we can help. We respond within 24 hours — usually much sooner.